Our Services
K-Ray provides inspections and recertification for all high pressure surface piping that is used in pressure pumping operations. Examples of these applications are fracing, fluid pumping, nitrogen pumping, productions testing (flow back) and cementing.
The published minimum requirement is a Level 1 inspection annually. Customers may choose to have a Level 2 or 3 inspection done to provide additional confidence in equipment safety.
K-Ray’s processes ensure a customer’s High Pressure Iron (HPI) equipment is free of flaws, damages, defects, or excessive wear that would render the equipment out of conformance and unsafe for use under high pressure and/or it’s intended application.
As an added service for all High Pressure Iron (HPI) customers, all of your inspection reports are saved online on our database, K-Ray Energy Services’ online asset management database exclusively for our Inspection and Recertification customers.
Secured by log-in and password our customers can now access collected data, along with inspection and recertification reports online from our database.
K-Ray wants all of our inspection and recertification customers to reap the benefits of improved safety, maximized asset use, and minimized maintenance costs.
Our database can be accessed anywhere our customers have an internet connection and allows for the export of data into Excel and other formats, in the event that further customer analysis is required.
K-Ray Energy Services is excited to provide all these asset maximizing benefits to our customers and look forward to providing immediate benefits.
K-Ray Energy Services also provides in-house sandblasting and painting with industrial enamel.
LEVELS OF SERVICE |
||
LEVEL 1 SERVICE | LEVEL 2 SERVICE | LEVEL 3 SERVICE |
Inventory & entry into database | Inventory & entry into database | Add $16 per end |
Visual Inspection | Visual Inspection | Everything included in Level 1 and/or Level 2 |
(UT) Ultrasonic Thickness Testing | (UT) Ultrasonic Thickness Testing | (MPI) Magnetic Particle Inspection |
Grind wings, buff threads | Grind wings, buff threads | |
Dry molly threads and bull nose | Dry molly threads and bull nose | |
Hydrostatic Test | Hydrostatic Test | |
Sandblast & Paint | Sandblast & Paint | |
Primary Band | Primary Band | |
Replace retainer rings | Teardown & Rebuild | |
Replace retainer rings |
2″ IRON | 3″ IRON | 4″ IRON |
2″ LEVEL 1 | 3″ LEVEL 1 | 4″ LEVEL 1 |
2″ PUP JOINT LEVEL 1 | 3″ PUP JOINT LEVEL 1 | 4″ PUP JOINT LEVEL 1 |
2″ STYLE 10 SWIVEL JOINT LEVEL 1 | 3″ STYLE 10 SWIVEL JOINT LEVEL 1 | 4″ STYLE 10 SWIVEL JOINT LEVEL 1 |
2″ STYLE 50 SWIVEL JOINT LEVEL 2 | 3″ STYLE 50 SWIVEL JOINT LEVEL 2 | 4″ STYLE 50 SWIVEL JOINT LEVEL 2 |
2″ x 1″ 1502 PLUG VALVE LEVEL 2 | 3″ x 3″ 1502 PLUG VALVE LEVEL 2 | 4″ x 4″ 1502 PLUG VALVE LEVEL 2 |
2″ x 2″ 1502 PLUG VALVE LEVEL 2 | 3″ PRESSURE RELIEF VALVE LEVEL 2 | 4″ CHECK VALVE LEVEL 2 |
2″ PRESSURE RELIEF VALVE LEVEL 2 | 3″ N2 RELIEF VALVE LEVEL 2 | |
2″ CHECK VALVE LEVEL 2 | 3″ CHECK VALVE LEVEL 2 |